How to check the working condition of ironing plate for paver
release time:2019-3-28 15:52:28      hit count:2851


(1) Place the paver on the flat ground, set the elevation value to zero, drop the ironing pull and place it on a flat loose sandstone layer. After several minutes, put forward the ironing plate. Observe the indentation of the front end of the ironing plate on the sandstone layer. If the indentation is obvious, it indicates that the ironing pull is in normal condition; if the indentation is not obvious or the indentation appears in the back, it indicates that the ironing plate has appeared to varying degrees. Wear. After many experiments, it was found that the indentation was not obvious, which indicated that the ironing plate had been worn. The elevation of the paving machine is higher than that of the new machine, which also explains this problem.

(2) In order to further explore the extent of wear and tear of the ironing plate (of course, the deformation of the arm of the ironing plate can also be checked out in extremely unexpected circumstances), the pads with thickness of 1mm, 2mm, 2.5mm and 3mm are added at the lower connection of the ironing plate and the lifting arm respectively to increase the original elevation angle of the ironing plate and observe the improvement of the failure respectively. It is found by experiments that the pads with thickness of 1mm, 2mm, 2.5mm and 3mm are added to the lower connection of the ironing plate and the After adding the gasket with the thickness of 2.5mm, no failure was found in the paving of medium-sized asphalt concrete, but the paving of fine-grained asphalt concrete still has the phenomenon that the thickness is difficult to control.

(3) Through the inspection of (1) and (2), it can be concluded that the failure phenomenon has nothing to do with the automatic leveling system, but has something to do with the wear of the ironing plate. Considering that the failure phenomenon is related to the condition of the asphalt mixture and the running speed, it should be suspected that the wear of the front rammer caused by the wear of the ironing plate bottom plate can lead to these failure phenomena. The frequency of rammer is lowered, but the effect is not obvious. The disassembly inspection found that the front rammer had been severely worn, and the relative position between the lowest ramming stroke and the bottom plate of the ironing plate changed greatly.

When the rammer is in the lowest position, it is higher than the bottom plate worn by the ironing plate, which results in the front of the ironing plate forming a denser "material block" through the vibration and tamping of the rammer during paver paving. The "material block" has a greater buoyancy on the ironing plate than under normal conditions, thus preventing the pressing "feed" of the ironing plate, and at the same time, the serious wear and tear of the ironing plate bottom plate is also increased. The difficulty of downward pressure is aggravated, which leads to the phenomenon that the thickness of the leveling cylinder has not decreased although it has reached the maximum stroke position. With the increase of paving speed, the compactness of the compacted "material block" will be reduced, and the compactness will also be reduced, thus returning to the normal working state. In addition, under the same compaction effect, the "material block" formed by fine-grained asphalt concrete is denser than that of medium-grained asphalt concrete, so the failure phenomenon is much more serious when paving fine-grained asphalt concrete. As for the failure of the right side of the ironing plate, it is because the wear of the front part of the right side of the ironing plate and the rammer is much worse than that of the left side (in this case, the ironing plate has worn into trapezoidal cross section, the front part of the left side is only about 3 mm, while the normal thickness is 16 mm, and the front part of the left side wears more normally, about 13 mm).


Previous: What is the effect of adding retarder in cement concrete in sliding-form construction?
Next: How many meters can the curb stone slide be made a day? How is the construction efficiency?

Back to list

News you are interested in
在线视频观看一区| 国产成人无码91精品一区| av日韩在线观看一区二区三区| 欠欠草免费在线视频| 裸毛片视频在线视频| 亚洲美女后入在线播放| 亚洲精品成人无码app| 中文字幕一区二区日韩精品蜜臂| 92婷婷伊人久久精品一区二区| 久久69精品久久久久免| 鸡巴操美女小穴羞羞视频| 蜜臀av一区二区三区免费观| 国产精品视频一区二区三区分享| 翘臀小穴在线观看| 骚逼少妇被巨根爆插| 女人张开腿让男人捅个爽| 午夜性无码视频在线播放| 五月天国产成人免费视频| 被医生添奶头和下面好爽| 男人把鸡巴插入女人| 国产精品视频美熟女一区二区| 大逼女人污污视频| 国产无圣光一区福利二区| 一色道久久88加勒比一| 干女人逼逼的大几把| 熟妇女人妻丰满中文字幕| 国产合区在线一区二区三区| 日本免费无码一区二区到五区| 国产免费好大好硬| 胸大裸体美女视频| 丰满少妇被强入在线观看| 怎么样操女人的逼亚洲Av黄片段| 99久久久国产精品美女| 骚逼嫩鸡巴喷水视频| 女人被躁到高潮嗷嗷叫小| 国产成人AV一区二区在线观看| 欧美一区二区高清视频在线观看| 午夜国产精品午夜福利网| 在线精品亚洲观看不卡欧| 操逼操的翻白眼视频| 亚洲一区二区三区日本在线|